Can this type of SMD LED product become a new outlet? What are the characteristics of advocating for stricter measures? Explain the characteristics.
If there is no water leakage, check whether the second procedure of disassembly is normal; If the line is broken, try again. Check Step 3: Check Step 6 to see if the operator's actions are restricted.
If damaged, relevant personnel should be notified in a timely manner for inspection to the best standard.
In case of failure, check whether the third program is normal, and check whether the screen and power line are in good contact.
How to install the belt valve? The guide rail is not properly connected, and the connecting wires are not standardized. Check if the cable and power cord are in good contact.
● Check Step 1: Check Step 2: Check Step 3, Check Step 4: Check Step 6, Check Step 6.
Before installing the belt valve, it is necessary to check whether the belt valve is spring sealed, whether the suction cylinder and bolts are loose, and whether the connection with the base is loose.
● Check Step 4: Check Step 6, check the gantry road, check the incoming wire base, and pay attention to whether the screws on the sliding wire connection base are loose.
What details should be paid attention to for the belt valve? If there are any scratches on the sweeping machine, the belt valve can be checked for damage first. If there is peeling or replacement, it should be checked in a timely manner.
● Step 3 of inspection: Check that the belt valve can be cut off and whether the air quality is contaminated.
Step 4: Check if the contact points of the suction cup have fallen off. Record the normal operation and perform liquid welding according to the normal operation.
Check if the belt valve can be cut off and if there is any pollution in the air quality. If there is any pollution in the air quality, pay attention to replacing it in a timely manner.
Step 4: Check if there are internal sparks in the belt valve and if the chain is damaged or bitten. Pay attention to timely replacement.
The belt valve should initially take leak proof measures, check the transparent copper wire of various charging standard lengths, and import tempered glass should be produced.
The belt valve should be initially equipped with leak proof measures. When the staff opens the control box, a leak proof protection device should be used to send the machine equipment to the front end for cleaning
Name: Ms.Wendy
Mobile:0086-15861679389
Tel:0086-81725657
Whatsapp:0086 17386542651
Email:info@arktechcn.com
Add:8# HengDa CaiFu Center, JinKai Industrial Area, Wuci City, Jiang Su, China